fbpx
Name of the project Site Equipment installed
M/S MCW CNG Refueling station Mirpur, Kalshi, section-12, Dhaka, Bangladesh Ariel CNG compressor Package: ANGI ENERGY System, USA Capacity: 1300 M3/hr Driver: CAT Engine 4 throw, 5 stage, Air cooled, Horizontally opposed.
M/S AE CNG Refueling station Dhaka-Sylhet highway Shahepratab, Norshingdi Ariel CNG compressor Package: ANGI ENERGY System, USA Capacity: 1300 M3/hr Driver: CAT Engine 4 throw, 5 stage, Air cooled, Horizontally opposed.
M/S RS CNG Refueling station HazaribagBeribad, Dhaka. Ariel CNG compressor Package: ANGI ENERGY System, USA Capacity: 1300 M3/hr Driver: CAT Engine 4 throw, 5 stage, Air cooled, Horizontally opposed.
M/S City Overseas CNG Refueling station Dayagonj, Gendaria, Dhaka, Bangladesh Ariel CNG compressor Package: ANGI ENERGY System, USA Capacity: 1300 M3/hr Driver: CAT Engine 4 throw, 5 stage, Air cooled, Horizontally opposed.
M/S Eastern Refinery Ltd North Patenga, Chittagong. Centrifugal Pump Unit-1: capacity Unit-2: capacity Package from Apex fluid engineering, UK
M/S Eastern Refinery Ltd North Patenga, Chittagong. Explosion proof Electric Motor Unit-1: Unit-2: Package from M/S Louis Allis Alliance Motor inc, USA
M/S Eastern Refinery Ltd North Patenga, Chittagong. Water jetting system capacity: From M/S Gardner Denver water jetting system, USA
Urea Fertilizer Co Ltd. Polash, Norshingdi, Ghorahal, Bangladesh. Supply of Rigid Air Filter